Execution concentrates on solar photovoltaic panels of single-gem silicon solar panels were completed under Jodhpur conditions. Indistinguishable PV panels (7.5 Wp each) were fixed on iron point outlines with the arrangement to shift the panel at the ideal point in various months. In this investigation, one of the panels was cleaned every day while the other discontinuously after a period, shifting from 2 to 15 days. The voltage and current yield were estimated from each panel day by day at a time frame hour from 9 A.M. to 5 P.M. Solar radiation, the surrounding temperature, and wind speed was likewise recorded. The investigation uncovered that the impact of residue on the current output(I) of PV panels was more throughout the cold weather a long time than in summer.